Blast mitigation cells

Introducing the Tyne Gangway exclusive Blast Test Cell. It is rigidly constructed by bolting the aluminium structure to the ground and adhering via clamping glass panels to the structure.

The clamping system provides very simple access to change one panel, thus providing a highly effective, yet low maintenance solution with simple install.

The Blast Test Cell is accompanied by a custom-built glass clad polycarbonate laminate with spall liner, designed to stop penetration of projectiles during high pressure testing of equipment such as sub-sea trees.

Click here to enquire